Interconnection study

Pick a bus, set the load, run. The study places the load, solves the grid, tests every outage, proposes upgrades and writes the report.

Four preset interconnection studies

Pick a town and a load size. Each result was calculated ahead of time for one point of interconnection, the bus where the new load connects to the grid. Clicking elsewhere on the map does not run a new study. The grid is synthetic: the town names are real, but the results say nothing about the actual utility.
Town
Additional load
✓ passes without upgrades + passes with upgrades ✕ no passing plan found Sizes are in MW.
Point of interconnection
No bus selected.
Load
What the study checks
  • Power flow and single outages (N-1)always
The year the load wants power. The future-year cases grow nearby load to it. Auto uses the earliest year the study finds.
About 30 seconds, plus 2 to 5 minutes with maintenance. Ends with the PDF report.
Details by step

1 Place load

2 Power flow

3 N minus 1

4 Upgrades

Maintenance and other outage types

5 Report

Off-peak and future-year cases

Ramp by year

Each step can be re-run on its own here. Times are server compute.

Or ask for the study in plain English.

    Marker A means the number is an assumption, hover to see the source and confidence.

    Get new chapters by email:

    Subscribe on Substack